PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Underground sanitary piping at Room 105 (Servery) Facing West (800x600).jpg Building rebar mats and columns for Elev. 5,6 (4th Floor) Facing North (800x600).jpg Constructing the Elev. door frames at Elev. 1,2,3 (3rd Floor) Facing North-West (800x600).jpg Installing metal decking at Derrick -3 (2nd Floor) Facing North (800x600).jpg Raised the slip forms at Elev. 5,6 to the 4th Floor Facing North-West (800x600).jpg
Previous page Raised the slip forms at Elev. 5,6 to the 4th Floor Facing North-West (800x600)
Raised the slip forms at Elev. 5,6 to the 4th Floor Facing North-West (800x600)